Wednesday, 18 January 2017
Production log 2
As I continued doing the planning for the documentary. I came across seeing the two paperwork which I wanted to do before the next entry they were the budget work and crew list work. What I need to do to in the budget paperwork is to show how I will spent £5000 in my documentary and how it will be allocated. In the crew list paperwork I was told to write down the names on who will help me do the documentary.
During the lesson on friday I was told that i had to make some on the narrative arc and I was told the deadline on when all the planning had to be done which was next Friday. I made the changes and continue my planning for my documentary. I have not yet uploaded any of my work for planning on the blog yet but I will once I have finished doing the planning.
I managed to achieve finishing off the budget and the crew list paperwork before this entry. They were not that hard to completed. However I did face a quite a lot of problem when doing the budget as I told that i needed to illustrated how i would spent £5000 pounds all together however I went over the budget quite a lot times. In the end i manged to show how I will would spent £5000 for my documentary.
By the next time I do make entry log for my work I should done the call sheets and the risk assessment. What I need to do in the call sheet is to type out the location of where i will be filming and when I will be filming in the specific location and who will be helping me film in the location. In the risk assessment I will need to make 1 risk assessment for each location I intend to film. I will need to type out for each risk assessment, explain the risk that I may face in the location and how I will prevent facing the situation.
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment